The challenge
The data center had to install a long, heavy server rack directly below its designated mounting point, then lift it to a height of 16 feet. Space constraints and sensitive floor utilities ruled out conventional equipment.
Cranes could not be used indoors, forklifts lacked maneuverability, and any point-loaded system risked damaging the infrastructure below. The customer required a solution capable of both horizontal precision and vertical lift—without downtime or risk to surrounding systems.