The challenge
Ganz’s legacy transport system relied on manual handling and deteriorated air casters—industrial “balloons” that could no longer keep up with production demands. Pressure had to be regulated manually, which introduced human error and caused regular downtime. The system no longer met modern safety standards, and a full replacement would have been too disruptive. Ganz needed a reliable retrofit that preserved the core process while eliminating risk and inefficiency.
